Service Hotline:18906617546
Products center
Step 1: clean the feeding hopper, then discharge all remaining materials from the pipe and pour in the cleaning agent.
Step 2: adjust the back pressure of the injection molding machine to "zero". The injection speed, pressure and screw speed should be as large as possible.
Step 3: when all the injection material is replaced with the cleaning material of xcleantm, the dose will be reduced and the injection will be measured repeatedly, and the nozzle part will be cleaned with emphasis until it is completely clean.
Step 4: clean the feeding cylinder, adjust the forming conditions, add follow-up materials, discharge the remaining cleaning agent in the feeding tube, and start normal production.
Set the machine parameters
Matters needing attention
Please read MSDS carefully before using it
Do not mix with other materials
Notes for specific use:
1. Use directly without drying
2. When the screw loads are large, please reduce the number of turns.
3. The cleaning effect will be reduced and liquefied when the cleaning material of xcleantm is used above the specified temperature.
4. For the extrusion molding machine, remove the die head after cleaning and remove the cleaning agent attached to the die head.
5. It is normal to have a small amount of smoke and slight taste during operation. Please feel free to use it.
Legal Notice|©Ningbo Trustbelley Polymer Co., LtdAll rights reserved浙ICP备18026565号